Confirmation of high voltage electrical conduit work in basement of BRAC University new campus project
This record consists of general correspondence regarding confirmation of high voltage electrical conduit work in basement of BRAC University new campus project.
Hovedforfatter: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/20338 |
Lignende værker
-
Confirmation of high voltage electrical conduit work in basement
af: Brac University
Udgivet: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
An efficient algorithm for detecting traffic congestion and a framework for smart traffic control system
af: Karim, Dewan Tanzim ul, et al.
Udgivet: (2016) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
High voltage engineering : fundamentals /
af: Kuffel, E.
Udgivet: (2000)