Adopting EPC mode for the BRAC University new campus project
This record consists of general correspondence regarding adopting EPC mode for the BRAC University new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20335 |
Documenti analoghi
-
Letter of information of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Performance security of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Assigning BRAC University security guard at BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Brand of the supplied cement for BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Preparing master schedule of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023)