Adopting EPC mode for the BRAC University new campus project
This record consists of general correspondence regarding adopting EPC mode for the BRAC University new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20335 |
Παρόμοια τεκμήρια
-
Letter of information of BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Performance security of BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Assigning BRAC University security guard at BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Brand of the supplied cement for BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Preparing master schedule of BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023)