Lack of drawings for quotation preparation
This record consists of general correspondence regarding lack of drawings for quotation preparation of BRAC University new campus project.
Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20334 |
Míreanna comhchosúla
-
The quotation of the design of extra work
de réir: BUCG
Foilsithe / Cruthaithe: (2023) -
Quotation schedule for the additional works
de réir: BUCG
Foilsithe / Cruthaithe: (2023) -
Request for extension of time for quotation of extra works of BRAC University new campus project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
VO #036 Quotation for additional steel structure of BRAC University new campus project
de réir: BUCG-ABC Joint Venture
Foilsithe / Cruthaithe: (2023)