Lack of drawings for quotation preparation
This record consists of general correspondence regarding lack of drawings for quotation preparation of BRAC University new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20334 |
Παρόμοια τεκμήρια
-
The quotation of the design of extra work
ανά: BUCG
Έκδοση: (2023) -
Quotation schedule for the additional works
ανά: BUCG
Έκδοση: (2023) -
Request for extension of time for quotation of extra works of BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
VO #036 Quotation for additional steel structure of BRAC University new campus project
ανά: BUCG-ABC Joint Venture
Έκδοση: (2023)