Lack of drawings for quotation preparation
This record consists of general correspondence regarding lack of drawings for quotation preparation of BRAC University new campus project.
| Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Format: | General correspondence |
| Idioma: | English |
| Publicat: |
Brac University
2023
|
| Matèries: | |
| Accés en línia: | http://hdl.handle.net/10361/20334 |
Ítems similars
-
The quotation of the design of extra work
per: BUCG
Publicat: (2023) -
Quotation schedule for the additional works
per: BUCG
Publicat: (2023) -
Request for extension of time for quotation of extra works of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
VO #036 Quotation for additional steel structure of BRAC University new campus project
per: BUCG-ABC Joint Venture
Publicat: (2023)