CIF cost breakdown for steel structure works of BRAC University new campus project
This record consists of general correspondence regarding CIF cost breakdown for steel structure works of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20326 |
Documents similaires
-
Proposal resubmission of VO #09 & 010 for steel structure works of BRAC University new campus project
par: BUCG-ABC Joint Venture
Publié: (2023) -
Request to open new work order for the steel structure work of BRAC University new campus project
par: BUCG-ABC Joint Venture
Publié: (2023) -
Cover page of steel structure as-built drawing of BRAC University New Campus Project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
Documents of supporting rates for prefabricated steel structure works of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
VO #036 Quotation for additional steel structure of BRAC University new campus project
par: BUCG-ABC Joint Venture
Publié: (2023)