CIF cost breakdown for steel structure works of BRAC University new campus project
This record consists of general correspondence regarding CIF cost breakdown for steel structure works of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/20326 |
Ejemplares similares
-
Proposal resubmission of VO #09 & 010 for steel structure works of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Request to open new work order for the steel structure work of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Cover page of steel structure as-built drawing of BRAC University New Campus Project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2024) -
Documents of supporting rates for prefabricated steel structure works of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
VO #036 Quotation for additional steel structure of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado: (2023)