Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
This record consists of general correspondence regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors of BRACU new campus building.
Huvudupphovsman: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/20312 |
Liknande verk
-
Regarding post level survey of the building or at least near the escalator opening area in all the floors
av: Brac University
Publicerad: (2023) -
Re: Regarding Contractor's All Risk insurance
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Adaptation of the assessment processes and its impact on learners: during and post-Covid19 situation in Bangladesh
av: Tabassum, Rezuana
Publicerad: (2023) -
Reference level marking on each floor of BRAC University new campus project
av: BUCG-ABC Joint Venture
Publicerad: (2023) -
Taking the Floor
av: Beunza