Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
This record consists of general correspondence regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors of BRACU new campus building.
מחבר ראשי: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/20312 |
פריטים דומים
-
Regarding post level survey of the building or at least near the escalator opening area in all the floors
מאת: Brac University
יצא לאור: (2023) -
Re: Regarding Contractor's All Risk insurance
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Adaptation of the assessment processes and its impact on learners: during and post-Covid19 situation in Bangladesh
מאת: Tabassum, Rezuana
יצא לאור: (2023) -
Reference level marking on each floor of BRAC University new campus project
מאת: BUCG-ABC Joint Venture
יצא לאור: (2023) -
Taking the Floor
מאת: Beunza