Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
This record consists of general correspondence regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors of BRACU new campus building.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20312 |
Παρόμοια τεκμήρια
-
Regarding post level survey of the building or at least near the escalator opening area in all the floors
ανά: Brac University
Έκδοση: (2023) -
Re: Regarding Contractor's All Risk insurance
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Adaptation of the assessment processes and its impact on learners: during and post-Covid19 situation in Bangladesh
ανά: Tabassum, Rezuana
Έκδοση: (2023) -
Reference level marking on each floor of BRAC University new campus project
ανά: BUCG-ABC Joint Venture
Έκδοση: (2023) -
Taking the Floor
ανά: Beunza