Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
This record consists of general correspondence regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors of BRACU new campus building.
Egile nagusia: | |
---|---|
Formatua: | General correspondence |
Hizkuntza: | English |
Argitaratua: |
Brac University
2023
|
Gaiak: | |
Sarrera elektronikoa: | http://hdl.handle.net/10361/20312 |
id |
10361-20312 |
---|---|
record_format |
dspace |
spelling |
10361-203122023-08-31T21:02:41Z Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project General correspondence Post level survey This record consists of general correspondence regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors of BRACU new campus building. 2023-08-31T09:14:22Z 2023-08-31T09:14:22Z ©2020 2020-07-12 General correspondence Ref.: BUCG-ABC JV/BRACU/116/20 http://hdl.handle.net/10361/20312 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 16 pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project General correspondence Post level survey |
spellingShingle |
New campus project General correspondence Post level survey BUCG-ABC Joint Venture (BUCG-ABC JV) Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors |
description |
This record consists of general correspondence regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors of BRACU new campus building. |
format |
General correspondence |
author |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
author_facet |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
author_sort |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
title |
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors |
title_short |
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors |
title_full |
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors |
title_fullStr |
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors |
title_full_unstemmed |
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors |
title_sort |
re: regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/20312 |
work_keys_str_mv |
AT bucgabcjointventurebucgabcjv reregardingurgencytotakepostlevelsurveyofthebuildingoratleastneartheescalatoropeningareainallthefloors |
_version_ |
1814309514370875392 |