JV), B. J. V. (. (2023). Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors. Brac University.
Chicago (17e ed.) BronvermeldingJV), BUCG-ABC Joint Venture (BUCG-ABC. Re: Regarding Urgency to Take Post Level Survey of the Building or at Least Near the Escalator Opening Area in All the Floors. Brac University, 2023.
MLA (8e ed.) BronvermeldingJV), BUCG-ABC Joint Venture (BUCG-ABC. Re: Regarding Urgency to Take Post Level Survey of the Building or at Least Near the Escalator Opening Area in All the Floors. Brac University, 2023.
Let op: Deze citaties zijn niet altijd 100% accuraat.