JV), B. J. V. (. (2023). Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors. Brac University.
Chicagoスタイル(17版)引用形式JV), BUCG-ABC Joint Venture (BUCG-ABC. Re: Regarding Urgency to Take Post Level Survey of the Building or at Least Near the Escalator Opening Area in All the Floors. Brac University, 2023.
MLA(8版)引用形式JV), BUCG-ABC Joint Venture (BUCG-ABC. Re: Regarding Urgency to Take Post Level Survey of the Building or at Least Near the Escalator Opening Area in All the Floors. Brac University, 2023.
警告: この引用は必ずしも正確ではありません.