JV), B. J. V. (. (2023). Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors. Brac University.
Cita Chicago Style (17a ed.)JV), BUCG-ABC Joint Venture (BUCG-ABC. Re: Regarding Urgency to Take Post Level Survey of the Building or at Least Near the Escalator Opening Area in All the Floors. Brac University, 2023.
Cita MLA (8a ed.)JV), BUCG-ABC Joint Venture (BUCG-ABC. Re: Regarding Urgency to Take Post Level Survey of the Building or at Least Near the Escalator Opening Area in All the Floors. Brac University, 2023.
Precaución: Estas citas no son 100% exactas.