JV), B. J. V. (. (2023). Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors. Brac University.
Cita Chicago (17th ed.)JV), BUCG-ABC Joint Venture (BUCG-ABC. Re: Regarding Urgency to Take Post Level Survey of the Building or at Least Near the Escalator Opening Area in All the Floors. Brac University, 2023.
Cita MLA (8th ed.)JV), BUCG-ABC Joint Venture (BUCG-ABC. Re: Regarding Urgency to Take Post Level Survey of the Building or at Least Near the Escalator Opening Area in All the Floors. Brac University, 2023.
Atenció: Aquestes cites poden no estar 100% correctes.