Request to release balance amount under BOQ 3.6
This record consists of general correspondence regarding request to release balance amount under BOQ 3.6 of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20307 |
Registos relacionados
-
Toilet partition works [BOQ item no. 8.1.12]
Por: Brac University
Publicado em: (2023) -
Initial observation on the BMS system design drawings and BOQ
Por: Brac University
Publicado em: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
Por: Brac University
Publicado em: (2023) -
The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
Por: Brac University
Publicado em: (2023) -
Observation on the electrical design drawings and BoQ
Por: Brac University
Publicado em: (2023)