Request to release balance amount under BOQ 3.6
This record consists of general correspondence regarding request to release balance amount under BOQ 3.6 of BRAC University new campus project.
Egile nagusia: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formatua: | General correspondence |
Hizkuntza: | English |
Argitaratua: |
Brac University
2023
|
Gaiak: | |
Sarrera elektronikoa: | http://hdl.handle.net/10361/20307 |
Antzeko izenburuak
-
Toilet partition works [BOQ item no. 8.1.12]
nork: Brac University
Argitaratua: (2023) -
Initial observation on the BMS system design drawings and BOQ
nork: Brac University
Argitaratua: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
nork: Brac University
Argitaratua: (2023) -
The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
nork: Brac University
Argitaratua: (2023) -
Observation on the electrical design drawings and BoQ
nork: Brac University
Argitaratua: (2023)