Request to release balance amount under BOQ 3.6
This record consists of general correspondence regarding request to release balance amount under BOQ 3.6 of BRAC University new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20307 |
Παρόμοια τεκμήρια
-
Toilet partition works [BOQ item no. 8.1.12]
ανά: Brac University
Έκδοση: (2023) -
Initial observation on the BMS system design drawings and BOQ
ανά: Brac University
Έκδοση: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
ανά: Brac University
Έκδοση: (2023) -
The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
ανά: Brac University
Έκδοση: (2023) -
Observation on the electrical design drawings and BoQ
ανά: Brac University
Έκδοση: (2023)