Request to release balance amount under BOQ 3.6
This record consists of general correspondence regarding request to release balance amount under BOQ 3.6 of BRAC University new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20307 |
Eitemau Tebyg
-
Toilet partition works [BOQ item no. 8.1.12]
gan: Brac University
Cyhoeddwyd: (2023) -
Initial observation on the BMS system design drawings and BOQ
gan: Brac University
Cyhoeddwyd: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
gan: Brac University
Cyhoeddwyd: (2023) -
The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
Observation on the electrical design drawings and BoQ
gan: Brac University
Cyhoeddwyd: (2023)