Request to release balance amount under BOQ 3.6
This record consists of general correspondence regarding request to release balance amount under BOQ 3.6 of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20307 |
Ítems similars
-
Toilet partition works [BOQ item no. 8.1.12]
per: Brac University
Publicat: (2023) -
Initial observation on the BMS system design drawings and BOQ
per: Brac University
Publicat: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
per: Brac University
Publicat: (2023) -
The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
per: Brac University
Publicat: (2023) -
Observation on the electrical design drawings and BoQ
per: Brac University
Publicat: (2023)