Request to release balance amount under BOQ 3.6
This record consists of general correspondence regarding request to release balance amount under BOQ 3.6 of BRAC University new campus project.
| Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Định dạng: | General correspondence |
| Ngôn ngữ: | English |
| Được phát hành: |
Brac University
2023
|
| Những chủ đề: | |
| Truy cập trực tuyến: | http://hdl.handle.net/10361/20307 |
Những quyển sách tương tự
-
Toilet partition works [BOQ item no. 8.1.12]
Bằng: Brac University
Được phát hành: (2023) -
Initial observation on the BMS system design drawings and BOQ
Bằng: Brac University
Được phát hành: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
Bằng: Brac University
Được phát hành: (2023) -
The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
Bằng: Brac University
Được phát hành: (2023) -
Observation on the electrical design drawings and BoQ
Bằng: Brac University
Được phát hành: (2023)