Regarding D-wall surface water leakage of BRAC University new campus project
This record consists of general correspondence regarding regarding D-wall surface water leakage of BRAC University new campus project.
Príomhchruthaitheoir: | BUCG-ABC Joint Venture |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20293 |
Míreanna comhchosúla
-
Regarding D-wall surface water leakage
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Request regarding the remedial work of D- wall
de réir: BUCG-ABC Joint Venture
Foilsithe / Cruthaithe: (2023) -
Mixed FBB and RBB low leakage technique for high durable CMOS circuit
de réir: Barua, Parag, et al.
Foilsithe / Cruthaithe: (2016) -
Re-rectification of D-wall
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Regarding the testing holes in the diaphragm wall of BRAC University new campus project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023)