Time extension of design change for 6th-8th floor
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20288 |
相似书籍
-
Time extension of design change for 6th-8th floor
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
8th floor slab, beam and column
由: WOHA Designs PTE LTD, et al.
出版: (2023) -
6th floor slab, beam and column
由: WOHA Designs PTE LTD, et al.
出版: (2023) -
Issue about finishing the floor works on 4th & 5th floor
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
8F floor tiles layout and finishes (RFA-476_Rev.B)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)