Time extension of design change for 6th-8th floor
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building.
Päätekijä: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20288 |
Samankaltaisia teoksia
-
Time extension of design change for 6th-8th floor
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
8th floor slab, beam and column
Tekijä: WOHA Designs PTE LTD, et al.
Julkaistu: (2023) -
6th floor slab, beam and column
Tekijä: WOHA Designs PTE LTD, et al.
Julkaistu: (2023) -
Issue about finishing the floor works on 4th & 5th floor
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
8F floor tiles layout and finishes (RFA-476_Rev.B)
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023)