Time extension of design change for 6th-8th floor
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20288 |
Similar Items
-
Time extension of design change for 6th-8th floor
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
8th floor slab, beam and column
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
6th floor slab, beam and column
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
Issue about finishing the floor works on 4th & 5th floor
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
8F floor tiles layout and finishes (RFA-476_Rev.B)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)