Time extension of design change for 6th-8th floor
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20288 |