Request to change concrete grade C10 into C15 for lean/blinding concrete
This record consists of general correspondence regarding request to change concrete grade C10 into C15 for lean/blinding concrete of BRAC University new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20287 |
Gelijkaardige items
-
Request to change concrete grade C10 to C15 for lean blinding concrete
door: Brac University
Gepubliceerd in: (2023) -
Request for cement supply for structure concrete casting
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Request replacement of concrete mixing plant station
door: BUCG-ABC Joint Venture
Gepubliceerd in: (2023) -
Concrete design /
door: Gaventa, Sarah
Gepubliceerd in: (2001) -
Supplying of ready mix concrete for construction of BRACU project
door: ABC Building Products Ltd
Gepubliceerd in: (2023)