Time extension of design change for 6th-8th floor
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building.
Yazar: | |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20286 |
Search Result 1
Yazar: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi 2023
Tam Metin ErişimBaskı/Yayın Bilgisi 2023
General correspondence