Time extension of design change for 6th-8th floor
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20286 |
Những quyển sách tương tự
-
Time extension of design change for 6th-8th floor
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
8th floor slab, beam and column
Bằng: WOHA Designs PTE LTD, et al.
Được phát hành: (2023) -
6th floor slab, beam and column
Bằng: WOHA Designs PTE LTD, et al.
Được phát hành: (2023) -
Issue about finishing the floor works on 4th & 5th floor
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
8F floor tiles layout and finishes (RFA-476_Rev.B)
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)