Time extension of design change for 6th-8th floor
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRACU new campus building.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20286 |
Registros relacionados
-
Time extension of design change for 6th-8th floor
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
8th floor slab, beam and column
por: WOHA Designs PTE LTD, et al.
Publicado em: (2023) -
6th floor slab, beam and column
por: WOHA Designs PTE LTD, et al.
Publicado em: (2023) -
Issue about finishing the floor works on 4th & 5th floor
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
8F floor tiles layout and finishes (RFA-476_Rev.B)
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023)