Regarding acceptance of steel structure
This record consists of general correspondence regarding the acceptance of steel structure from 11th to 15th batches for BRACU new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20276 |
مواد مشابهة
-
Regarding confirming remaining 3468.302t steel structure elements list
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Proposal resubmission of VO#010 for steel structure works
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Reply to shipment of pre-fabricated steel structure against LC no. 0000021619010057
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
The engineer's instruction to complete steel structure works
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)