Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
This record consists of general correspondence regarding the 33/11KV substation (external substation) and temporary substation (internal substation) of BRACU new campus project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20268 |
相似书籍
-
Regarding the temporary substation (internal substation) of the project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Documents for temporary substation
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Application for the refund of the temporary substation fee returned by DESCO
由: BUCG-ABC Joint Venture
出版: (2023) -
Request for final due payment for temporary substation work of BRAC University new campus project
由: B-Trac Engineering Ltd.
出版: (2023) -
Instruction to start the work of substation at BRACU new campus project
由: Brac University
出版: (2023)