APA (7. basım) Alıntı

JV), B. J. V. (. (2023). Regarding the 33/11KV substation (external substation) and temporary substation (internal substation). Brac University.

Chicago Style (17. basım) Atıf

JV), BUCG-ABC Joint Venture (BUCG-ABC. Regarding the 33/11KV Substation (external Substation) and Temporary Substation (internal Substation). Brac University, 2023.

MLA (8th ed.) Atıf

JV), BUCG-ABC Joint Venture (BUCG-ABC. Regarding the 33/11KV Substation (external Substation) and Temporary Substation (internal Substation). Brac University, 2023.

Uyarı: Bu alıntı herzaman %100 doğru olmayabilir..