Construction production be adversely affected by modification of original design of BRAC University new campus project
This record consists of general correspondence regarding construction production be adversely affected by modification of original design of BRAC University new campus project.
Huvudupphovsman: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/20265 |
Liknande verk
-
Construction production be adversely affected by modification of original design
av: Brac University
Publicerad: (2023) -
Requesting for modification on the list of drawing of BRAC University new campus project
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Construction schedule of BRAC University new campus project from January to March 2020
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Behavior modification in applied settings /
av: Kazdin, Alan E.
Publicerad: (1975) -
Clarification for the master construction schedule of BRAC University new campus project
av: BUCG-ABC Joint Venture
Publicerad: (2023)