Construction production be adversely affected by modification of original design of BRAC University new campus project
This record consists of general correspondence regarding construction production be adversely affected by modification of original design of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20265 |
Registros relacionados
-
Construction production be adversely affected by modification of original design
por: Brac University
Publicado em: (2023) -
Requesting for modification on the list of drawing of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Construction schedule of BRAC University new campus project from January to March 2020
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Behavior modification in applied settings /
por: Kazdin, Alan E.
Publicado em: (1975) -
Clarification for the master construction schedule of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado em: (2023)