Construction production be adversely affected by modification of original design of BRAC University new campus project
This record consists of general correspondence regarding construction production be adversely affected by modification of original design of BRAC University new campus project.
Egile nagusia: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formatua: | General correspondence |
Hizkuntza: | English |
Argitaratua: |
Brac University
2023
|
Gaiak: | |
Sarrera elektronikoa: | http://hdl.handle.net/10361/20265 |
Antzeko izenburuak
-
Construction production be adversely affected by modification of original design
nork: Brac University
Argitaratua: (2023) -
Requesting for modification on the list of drawing of BRAC University new campus project
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023) -
Construction schedule of BRAC University new campus project from January to March 2020
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023) -
Behavior modification in applied settings /
nork: Kazdin, Alan E.
Argitaratua: (1975) -
Clarification for the master construction schedule of BRAC University new campus project
nork: BUCG-ABC Joint Venture
Argitaratua: (2023)