The status of MEP IFC drawing
This record consists of general correspondence regarding the status of MEP IFC drawing of BRAC University new campus project.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20256 |
Những quyển sách tương tự
-
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Revised IFC drawings impact to the construction period
Bằng: Brac University
Được phát hành: (2023) -
IFC drawing queries
Bằng: Brac University
Được phát hành: (2023) -
Work interface of high voltage electrical and IFC drawing
Bằng: Brac University
Được phát hành: (2023)