The status of MEP IFC drawing
This record consists of general correspondence regarding the status of MEP IFC drawing of BRAC University new campus project.
Yazar: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20256 |
Benzer Materyaller
-
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Revised IFC drawings impact to the construction period
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
IFC drawing queries
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Work interface of high voltage electrical and IFC drawing
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)