The status of MEP IFC drawing
This record consists of general correspondence regarding the status of MEP IFC drawing of BRAC University new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20256 |
समान संसाधन
-
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Revised IFC drawings impact to the construction period
द्वारा: Brac University
प्रकाशित: (2023) -
IFC drawing queries
द्वारा: Brac University
प्रकाशित: (2023) -
Work interface of high voltage electrical and IFC drawing
द्वारा: Brac University
प्रकाशित: (2023)