The status of MEP IFC drawing
This record consists of general correspondence regarding the status of MEP IFC drawing of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20256 |
Documents similaires
-
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Revised IFC drawings impact to the construction period
par: Brac University
Publié: (2023) -
IFC drawing queries
par: Brac University
Publié: (2023) -
Work interface of high voltage electrical and IFC drawing
par: Brac University
Publié: (2023)