The status of MEP IFC drawing
This record consists of general correspondence regarding the status of MEP IFC drawing of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20256 |
Ítems similars
-
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Revised IFC drawings impact to the construction period
per: Brac University
Publicat: (2023) -
IFC drawing queries
per: Brac University
Publicat: (2023) -
Work interface of high voltage electrical and IFC drawing
per: Brac University
Publicat: (2023)