Evaluation for additional work of sharing pile work between zone A and zone C – 05.04.18
This record consists of general correspondence regarding the evaluation for additional work of sharing pile work between zone A and zone C of BRACU new campus development project.
मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20255 |
समान संसाधन
-
Evaluation for additional work of shoring pile work in zone B
द्वारा: BUCG-ABC Joint Venture
प्रकाशित: (2023) -
Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Evaluation for additional work of shoring pile work between zone B
द्वारा: Brac University
प्रकाशित: (2023) -
Notice for additional work of king post pile
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Evaluation for additional work of shoring pile work between zone A and C
द्वारा: Brac University
प्रकाशित: (2023)