Cost analysis of breaking unforeseeable piles of BRAC University new campus project
This record consists of general correspondence regarding cost analysis of breaking unforeseeable piles of BRAC University new campus project.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20247 |
Podobne zapisy
-
Cost analysis of breaking unforeseeable pile of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Cost analysis of breaking unforeseeable piles
od: Brac University
Wydane: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
od: BUCG-ABC Joint Venture
Wydane: (2023) -
VO #015 Proposal of bored pile works of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
od: BUCG-ABC Joint Venture
Wydane: (2023)