Cost analysis of breaking unforeseeable piles of BRAC University new campus project
This record consists of general correspondence regarding cost analysis of breaking unforeseeable piles of BRAC University new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20247 |
Documenti analoghi
-
Cost analysis of breaking unforeseeable pile of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Cost analysis of breaking unforeseeable piles
di: Brac University
Pubblicazione: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
di: BUCG-ABC Joint Venture
Pubblicazione: (2023) -
VO #015 Proposal of bored pile works of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
di: BUCG-ABC Joint Venture
Pubblicazione: (2023)