Cost analysis of breaking unforeseeable piles of BRAC University new campus project
This record consists of general correspondence regarding cost analysis of breaking unforeseeable piles of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20247 |
Documents similaires
-
Cost analysis of breaking unforeseeable pile of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Cost analysis of breaking unforeseeable piles
par: Brac University
Publié: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
par: BUCG-ABC Joint Venture
Publié: (2023) -
VO #015 Proposal of bored pile works of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
par: BUCG-ABC Joint Venture
Publié: (2023)