Cost analysis of breaking unforeseeable piles of BRAC University new campus project
This record consists of general correspondence regarding cost analysis of breaking unforeseeable piles of BRAC University new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20247 |
Eitemau Tebyg
-
Cost analysis of breaking unforeseeable pile of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Cost analysis of breaking unforeseeable piles
gan: Brac University
Cyhoeddwyd: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
VO #015 Proposal of bored pile works of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023)