Cost analysis of breaking unforeseeable piles of BRAC University new campus project
This record consists of general correspondence regarding cost analysis of breaking unforeseeable piles of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20247 |
Ítems similars
-
Cost analysis of breaking unforeseeable pile of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Cost analysis of breaking unforeseeable piles
per: Brac University
Publicat: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
per: BUCG-ABC Joint Venture
Publicat: (2023) -
VO #015 Proposal of bored pile works of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
per: BUCG-ABC Joint Venture
Publicat: (2023)