Cost analysis of breaking unforeseeable piles of BRAC University new campus project
This record consists of general correspondence regarding cost analysis of breaking unforeseeable piles of BRAC University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20247 |
مواد مشابهة
-
Cost analysis of breaking unforeseeable pile of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Cost analysis of breaking unforeseeable piles
بواسطة: Brac University
منشور في: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
VO #015 Proposal of bored pile works of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023)