Re: Instruction regarding VO#19 rain chain & cut-off ditch work
This record consists of general correspondence regarding the instruction regarding variation order of rain chain & cut-off ditch work for BRACU new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20221 |
Documents similaires
-
VO#019 rain chain & cut-off ditch work
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Instruction regarding VO#019 rain chain & cut-off ditch work of BRAC University new campus project
par: Brac University
Publié: (2023) -
Miscellaneous details for cut-off ditch in the south of utility building (RFA-364_Rev C)
par: WOHA Designs PTE LTD, et autres
Publié: (2023) -
Cut-off ditch for UB (Architectural As Built Drawings)
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
Detail of copper rain chain (RFA-296_Rev A)
par: WOHA Designs PTE LTD, et autres
Publié: (2023)